The Nu-Phalt infrared Road Repair System
 

Case Studies

Case Study: Cambridgeshire County Council

Cambridgeshire County Council report improved traffic management and a more streamlined system with no waste since implementing the Nu-Phalt Infrared Road Repair system for their potholes and other repairs.

Click here to read the case study. (PDF)

 

Case Study: Mercedes McLaren

The Mercedes Formula One team were in a tight corner when the practise track in the run-up to the Silverstone Grand Prix was unusable due to potholes. One emergency call to Nu-Phalt later, and the track was seamlessly repaired and ready for the winning team!

Click here to read the case study. (PDF)

 

Case Study: Dudley Metropolitan Borough Council

Dudley Metropolitan Borough Council has an ongoing contract with Nu-Phalt after a demonstration in Stourbridge showed them how durable, cost-effective and fast the Infrared Road Repair System is.

Click here to read the case study. (PDF)

 

Case Study: Scottish Sealife Centre

The Scottish Sealife Centre is 'business as usual' thanks Nu-Phalt's repairs.

Click here to read the case study. (PDF)

 

Case Study: Silverstone

Find out how Nu-Phalt helped Silverstone maintain its world-class racetrack.

Click here to read the case study. (PDF)

 

Latest News
  • Nu-Phalt wins Green Business Award!
  • And the winner of HAUC's Best Exhibition Stand is...Nu-Phalt!
  • Nu-Phalt achieves SAFEcontractor accreditation

Click here for more news

click here to book a demo
 
2 x 1 heater
ISO 9001 certified, BSi British Standard, Recycle, Safe contractor approved